an insulation mountain arrives ....

To Cordwood yesterday and an articulated lorry was gingerly making its way down the drive.

Almost the entire contents of the lorry were for us - huge polystyrene slabs that must be sawn and placed on the floors after we have laid a damp proof membrane.

Above the insulation will be fitted underfloor heating pipes and finally a screed of concrete will be laid.
Previous
Previous

first fix electrics begins

Next
Next

'gracile' arms